Drop inactive tunnels (#1413)

This commit is contained in:
Nate Brown
2025-06-23 11:32:50 -05:00
committed by GitHub
parent 8e0a7bcbb7
commit 9877648da9
13 changed files with 480 additions and 277 deletions

View File

@@ -303,6 +303,18 @@ logging:
# after receiving the response for lighthouse queries
#trigger_buffer: 64
# Tunnel manager settings
#tunnels:
# drop_inactive controls whether inactive tunnels are maintained or dropped after the inactive_timeout period has
# elapsed.
# In general, it is a good idea to enable this setting. It will be enabled by default in a future release.
# This setting is reloadable
#drop_inactive: false
# inactivity_timeout controls how long a tunnel MUST NOT see any inbound or outbound traffic before being considered
# inactive and eligible to be dropped.
# This setting is reloadable
#inactivity_timeout: 10m
# Nebula security group configuration
firewall: